Tapeout,
without guesswork.

From RTL freeze to foundry handoff, this dependency-aware readiness board opens the next gate with evidence, not a status label.

WORKSPACE / PUBLIC-SAFELOCAL

Never enter names, customer data, NDA values, netlists, or paths. Use only public-safe aliases and summaries.

Loading local recordNever sent outside this browser
READINESS0%
CLEARED GATES0 / 6

dependency + owner + evidence verified

OPEN BLOCKERS0

blocks, dependencies, missing proof

NEXT GATERTL Freeze

G0

DEPENDENCY LEDGER

Gate readiness board

Choose each state and record a public-safe owner and evidence note. Review receives 0.5 and Pass receives 1 only when all conditions are met.

G0

SOURCE OF TRUTH

RTL Freeze

READY

Freeze functions, interfaces, and exceptions to establish the reference point for downstream review.

DEPENDS ON
Start gate
PROOF LENS
release tag, lint/CDC summary, approved waiver reference
Gate status

Review has not started.

G1

LOGIC INTEGRITY

Formal / LEC

UPSTREAM HOLD

Check post-synthesis equivalence and key properties to show that logic transformation preserved intent.

DEPENDS ON
RTL Freeze
PROOF LENS
equivalence summary, property coverage, unresolved cone note
Gate status

Review has not started.

G2

TEST READINESS

DFT

UPSTREAM HOLD

Close scan, compression, MBIST, and test-mode readiness for manufacturing test.

DEPENDS ON
Formal / LEC
PROOF LENS
scan coverage, rule-check summary, test-mode constraint note
Gate status

Review has not started.

G3

PHYSICAL IMPLEMENTATION

P&R

UPSTREAM HOLD

Track congestion and physical constraints from floorplan through route to produce a review-ready database.

DEPENDS ON
DFT
PROOF LENS
route summary, congestion snapshot reference, final database tag
Gate status

Review has not started.

G4

ELECTRICAL SIGN-OFF

STA / SI / EMIR

UPSTREAM HOLD

Check timing, noise, and power-integrity risk against budgets across all required corners.

DEPENDS ON
P&R
PROOF LENS
corner matrix, WNS/TNS summary, SI and EMIR exception log
Gate status

Review has not started.

G5

FOUNDRY HANDOFF

DRC / LVS

UPSTREAM HOLD

Verify manufacturing rules and circuit equivalence for final layout and seal the release artifacts.

DEPENDS ON
STA / SI / EMIR
PROOF LENS
DRC/LVS summary, approved waiver IDs, stream-out checksum
Gate status

Review has not started.